Stage 2
The first stage of the job, was to prepare the ground and foundations for both the extension and garage. We were able to utilise our team and get both done simultaneously to be time and cost effective for the client. New drainage was installed at this point for the utility room.
Once the groundworks and foundations were ready, we were able to start building the extension around the rear of the house, and the garage to the side. Again, both were done at the same time, to utilise our team.
The garage was finished with a pitched roof as per the architects design, to be in keeping with the existing house. Matching side door and window to the extensions and grand new garage doors. The extension was finished with a flat roof with a lantern and bi-fold doors to flood the extension with light. The utility room was also fitted with an external door, for easy entry and access.
Once water tight we were able to screed the floors to the extension, the garage had a mass concrete slab laid to the floor.
At this point we were able to remove the back of the existing house, this was then boarded up to keep the clients current kitchen safe from the building works.
Plastering was now able to commence throughout, the extension, utility and garage.